一级毛片私人影院老司机_嫩草国产_日日夜夜拍拍_韩日a级片_三级网页_久久久不卡网国产精品一区

網站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

鍍鋅電纜橋架的設備標準規范有哪些?

熱鍍鋅電纜橋架的支撐點,如立柱、托臂或非規范支、構架的距離、設備方法、類型規范、標高.可以在平面上列表說明,也可分段標出;電纜引下點位置及引下方法,大批電纜引下可用垂直彎接板和垂直引上架,少數電纜引下,可用導板或引管,注明引下方法即可。

The support points of hot-dip galvanized cable trays, such as columns, brackets or non-standard supports, the distance between frames, equipment methods, type specifications, and elevations, can be listed and explained on the plane or marked in sections; The location and method of cable routing points can be determined by using vertical bending plates and vertical routing brackets for a large number of cables, and by using guide plates or conduits for a small number of cables, indicating the routing method.

熱鍍鋅電纜橋架要高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不小于0.3米,橋架寬度不小于0.1米,橋架內橫斷面的填充率不逾越50%;電纜橋架內纜線垂直敷設時,在纜線的上端和每距離1.5米處,應固定在橋架的支架上,水平敷設時,在纜線的首、尾、轉彎及每距離35米處進行固定;布放在線槽的纜線可以不綁扎,槽內纜線應順直,盡量不穿插,纜線不該溢出線槽,在纜線進出線槽部位,轉彎處應綁扎固定。垂直線槽布放攬線每距離1.5米處固定在纜線支架上;

20220531062337733.jpg

The hot-dip galvanized cable tray should be at least 2.2 meters above the ground, with the top of the tray not less than 0.3 meters away from the ceiling or other obstacles. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%; When laying cables vertically in cable trays, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters distance. When laying horizontally, they should be fixed at the beginning, end, turn, and every 3 to 5 meters distance; The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and not inserted as much as possible. The cables should not overflow the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at the turning points. The vertical cable tray is used to lay cables and fix them on the cable bracket at a distance of 1.5 meters;

在吊頂內設置時,槽蓋敞開面堅持80毫米的垂直凈空,線槽截面利用率不逾越50%;拿了橋架在進行水平敷設時,支撐距離一般為1.5-3m,垂直敷設時,固定在建筑物構體上的距離不小于2m;

When setting up in the ceiling, the open surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%; When laying the bridge horizontally, the support distance is generally 1.5-3m, and when laying vertically, the distance fixed to the building structure is not less than 2m;

在平行圖上繪出熱鍍鋅電纜橋架的路由,要注明橋架起點、完畢、拐彎點、分支點及升降點的坐標或定位尺度、標高,如能制作橋架敷設軸側圖,則對材料計算將更準;熱鍍鋅電纜橋架與用電設備交越時,凈距不小于0.5m;兩組電纜橋架在同一高度平行敷設時,凈距不小于0.6m;

Draw the route of hot-dip galvanized cable tray on a parallel diagram, indicating the coordinates or positioning scale and elevation of the starting point, completion point, turning point, branch point, and lifting point of the tray. If a cable tray laying axis side diagram can be made, the material calculation will be more accurate; When the hot-dip galvanized cable tray intersects with electrical equipment, the clear distance shall not be less than 0.5m; When two sets of cable trays are laid parallel at the same height, the clear distance should not be less than 0.6m;

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 国产视频中文字幕 | 91社区免费福利区体验一分钟 | 日韩在线观看中文字幕 | 亚洲精品久久久无码 | 国产成人在线播放 | 日本高清h色视频在线观看 亚洲性夜夜夜谢夜夜2019 | free台湾极品性hd | 热九九精品 | 婷婷人人爽人人爽人人A片 北条麻妃国产九九九精品小说 | 男人天堂a | 亚洲精品免费日日日夜夜夜夜 | 日韩一区在线播放 | 久久www免费人成看片入口 | 国产福利在线观看你懂的 | 亚洲www色| 国产日韩欧美精品在线 | 午夜一级做a爰片久久毛片 全部免费的毛片在线看hd | 天天干天天曰天天操 | 在线亚洲欧美 | 美国一级黄色片 | 国产日韩欧美综合 | 欧美性xxxxx极品娇小按摩 | 干妞网免费视频 | 无码AV国产精品一区二区 | 欧美不卡视频在线 | 日本精品视频一区二区 | 国产综合视频在线播放 | 在线观看中文字幕国产 | 特级精品毛片免费观看 | 日韩在线一区视频 | 欧美福利网站 | 一区二区三区国产 | 成年性视频bbixx | 国产网红主播在线视频观看 | a级片网站| 日本三级黄色网址 | 九九精品在线观看视频 | 中文字幕一区二区三区乱码图片 | 欧美日韩看片 | 免费观看一级特黄欧美大片 | 91视频啊啊啊|