四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

山東橋架和配線架的線纜整理的方法有哪些呢?

綜合布線系統(tǒng)工程中,由于線纜繁多,這些線纜就需要我們手動(dòng)去進(jìn)行整理,那么橋架和配線架的線纜整理的方法有哪些呢?綜合布線系統(tǒng)工程中,由于線纜繁多,這些線纜就需要我們手動(dòng)去進(jìn)行整理,那么山東橋架和配線架的線纜整理的方法有哪些呢?
In the generic cabling system project, due to the large number of cables, these cables need to be sorted manually. What are the methods for sorting the cables of bridge and distribution frame? In the generic cabling system project, due to the large number of cables, these cables need to be sorted manually. What are the methods for sorting the cables of Shandong bridge and distribution frame?
是如何整理橋架上的線纜:
First, how to arrange the cables on the bridge:
一般情況下,整理樓層山東橋架中的線纜并不是很困難,我們只要直接順著它的方向理順整理即可,不需進(jìn)行捆扎。另外,主干橋架中的線纜則需要使用扎帶進(jìn)行簡(jiǎn)單的捆扎,用來(lái)區(qū)別不同的樓層,并減少重力拉伸線纜,從而避免改變其物理屬性(絞合度、長(zhǎng)度等)和電氣性能。
In general, it is not very difficult to arrange the cables in the Shandong bridge on the floor. We just need to straighten them out directly along its direction without binding. In addition, the cables in the main bridge need to be simply bundled with ties to distinguish different floors and reduce the gravity stretching of cables, so as to avoid changing their physical properties (stranding degree, length, etc.) and electrical properties.
其次是如何整理配線架中的線纜,這部分需要細(xì)分為兩小節(jié):
The second is how to arrange the cables in the distribution frame. This part needs to be divided into two sections:
A:整理前面板線纜:如果交換機(jī)與配線架位于同一機(jī)柜中,則只需選擇適當(dāng)長(zhǎng)度的跳線,將跳線打個(gè)環(huán)后置于理線器中。然后,兩端分別連接交換機(jī)和配線架端口,所有連接都完成后,蓋上理線器的蓋板即可,如果配線架與交換機(jī)位于不同的機(jī)柜,那么需要使用較長(zhǎng)的跳線必須對(duì)跳線進(jìn)行整理。除了配線架和交換機(jī)的前面板需要使用理線器對(duì)線纜進(jìn)行整理外,垂直部分也應(yīng)當(dāng)使用垂直理線器進(jìn)行整理。
A: Tidy up the front panel cables: if the switch and the distribution frame are located in the same cabinet, just select a jumper of appropriate length, ring the jumper and place it in the cable manager. Then, connect both ends to the switch and distribution frame ports respectively. After all connections are completed, cover the cover plate of the line manager. If the distribution frame and the switch are located in different cabinets, longer jumpers need to be used, and the jumpers must be sorted out. In addition to the front panel of the distribution frame and the switch, the vertical part shall also be sorted by the vertical line manager.
B:整理后部線纜:配線架后部集中著網(wǎng)絡(luò)布線系統(tǒng)中的所有水平布線,因此有大量的線纜需要整理。在通常情況下,每一個(gè)配線架中的線纜在理順之后,應(yīng)當(dāng)使用尼龍?jiān)鷰б来卫υ潭āK骄€纜的捆扎固定方向應(yīng)當(dāng)左右交替,以便于垂直部分固定在機(jī)柜兩側(cè)。
B: Arrange the rear cables: all horizontal wiring in the network cabling system is concentrated at the rear of the distribution frame, so there are a large number of cables to be arranged. Under normal circumstances, after straightening out the cables in each distribution frame, they shall be bound and fixed successively with nylon ties. The binding and fixing direction of horizontal cables shall be alternately left and right, so that the vertical part can be fixed on both sides of the cabinet.
然后,再將所有垂直部分線纜依次捆扎固定在機(jī)柜的兩側(cè)。在捆扎固定線纜時(shí),應(yīng)當(dāng)注意不要過(guò)分折彎雙絞線,并且扎帶不要扎得過(guò)緊,以免影響線纜的電氣性能。
Then, bundle and fix all vertical cables on both sides of the cabinet in turn. When binding and fixing the cable, pay attention not to bend the twisted pair excessively, and do not tie the tie too tightly, so as not to affect the electrical performance of the cable.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318