四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

電纜橋架的高度要求是什么?

電纜橋架在我們的生活中很常見,但是很多人對電纜橋架并不是很了解。你知道電纜橋架的高度要求是什么嗎?下面,電纜橋架廠家為您詳細(xì)介紹,希望對您有所幫助!
Cable tray is very common in our life, but many people don't know much about it. Do you know the height requirement of cable tray? Next, cable tray manufacturers for your detailed introduction, I hope to help you!
一、檢查電纜橋架的高度要求:
1、 Check the height requirements of cable tray:
1、電纜橋架垂直放置時距地面高度不小于1.8m,水平放置時距地面高度不小于2.5m。
1. When the cable tray is placed vertically, the height from the ground shall not be less than 1.8m, and when it is placed horizontally, the height from the ground shall not be less than 2.5m.
2、不符合上述標(biāo)準(zhǔn)時,應(yīng)加金屬蓋板進(jìn)行保護(hù)。
2. If the above standards are not met, metal cover plate shall be added for protection.
3、特殊電氣室內(nèi)外的布置。
3. Special electrical indoor and outdoor layout.
4、電纜橋架水平放置時,離地高度小于2.5m,達(dá)到2.2m時,可用金屬罩保護(hù)。
4. When the cable tray is placed horizontally, the height above the ground is less than 2.5m, and when it reaches 2.2M, it can be protected by metal cover.
5、地下室在梁下2.2米,有的低于2.5米。
5. The basement is 2.2 meters under the beam, and some are less than 2.5 meters.
                                          濟(jì)南電纜橋架
二、索橋鋪裝標(biāo)準(zhǔn):
2、 Standard of cable bridge pavement:
1、不要占用人行橫道。
1. Don't occupy the crosswalk.
2、不占用維修區(qū)。
2. No maintenance area occupied.
3、干凈漂亮,大方得體。
3. Clean and beautiful, generous and decent.
一般來說,電纜橋架沿墻壁或天花板放置。路面的高度也要參考控制點(diǎn)的位置。不能太高,太高會增加裝修施工難度系數(shù)。
In general, cable trays are placed along walls or ceilings. The height of the road should also refer to the position of the control point. Not too high, too high will increase the difficulty coefficient of decoration construction.
三、電纜橋架規(guī)格的選用:
3、 Selection of cable tray specifications:
1、電纜橋架高度應(yīng)按上表選擇,應(yīng)符合標(biāo)準(zhǔn)電纜填充率,不得超過相關(guān)規(guī)范的規(guī)定值。電力電纜可占40-50%,控制電纜可占50-70%。此外,工藝開發(fā)應(yīng)留有10-25% 的余量。
1. The height of cable tray shall be selected according to the above table, which shall meet the standard cable filling rate and shall not exceed the specified value of relevant specifications. Power cable can account for 40-50%, control cable can account for 50-70%. In addition, 10-25% margin should be reserved for process development.
2、各種彎頭及管件的規(guī)格型號要符合標(biāo)準(zhǔn)工程設(shè)計(jì)標(biāo)準(zhǔn),并與電纜橋架相匹配。
2. The specifications and models of various elbows and pipe fittings shall meet the standard engineering design standards and match with the cable tray.
3、支架、吊架規(guī)格型號的選擇應(yīng)以橋架規(guī)格、層數(shù)、跨度等標(biāo)準(zhǔn)配置為依據(jù)。并且要滿足裝載要求。
3. The selection of specifications and models of supports and hangers shall be based on the specifications, layers, span and other standard configurations of the bridge. And to meet the loading requirements.
以上是對電纜橋架高度要求的介紹。相信大家看完這篇文章的介紹,都能對電纜橋架有了一定的認(rèn)識和了解。希望以上內(nèi)容可以幫到你。另外,如果您想了解更多關(guān)于橋架的信息,可以多關(guān)注我們網(wǎng)站的動態(tài)。
The above is an introduction to the height requirements of cable tray. I believe that after reading this article, you can have a certain understanding of cable tray. I hope the above can help you. In addition, if you want to know more about the bridge, you can pay more attention to the dynamic of our website.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318