四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.zkhtkj.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

保證電纜橋架質(zhì)量的措施有哪些?

1、施工前組織施工人員進(jìn)行技術(shù)交底工作,并做好交底會(huì)簽,將責(zé)任落實(shí)到每一個(gè)操作工人。
1. Organize the construction personnel to carry out technical submission work before construction, and do a good job of submission meeting signature, and implement the responsibility to every operator.
2、材料進(jìn)入施工現(xiàn)場(chǎng),必須按產(chǎn)品標(biāo)準(zhǔn)及規(guī)定程序進(jìn)行檢查驗(yàn)收,并做好記錄及材料報(bào)驗(yàn)工作,嚴(yán)禁不合格產(chǎn)品用于工程中。
2. When materials enter the construction site, they must be inspected and accepted according to the product standards and prescribed procedures, and record and material inspection should be done well. It is strictly forbidden to use unqualified products in engineering.
3、熟悉設(shè)計(jì)圖紙,理解并掌握設(shè)計(jì)意圖,發(fā)現(xiàn)問題及時(shí)聯(lián)系建設(shè)、監(jiān)理、設(shè)計(jì)單位,做好圖紙會(huì)審工作。
3. Familiar with design drawings, understand and master design intentions, contact construction, supervision and design units when problems are found, and do a good job of drawing auditing.
4、橋架的運(yùn)輸和堆放應(yīng)附合有關(guān)規(guī)定,注意防潮防污。
4. Transportation and stacking of bridge frames should be accompanied by relevant regulations, and attention should be paid to moisture-proof and pollution-proof.
5、使用高凳時(shí),注意不要碰壞建筑物的墻面及門窗。
5. When using high benches, be careful not to touch the walls and doors and windows of buildings.
6、嚴(yán)格按標(biāo)準(zhǔn)、規(guī)范、規(guī)程及設(shè)計(jì)圖紙組織施工,施工中應(yīng)與水暖、土建密切配合,施工質(zhì)量必須符合現(xiàn)行標(biāo)準(zhǔn)及規(guī)范規(guī)定。
電纜橋架
6. Construction should be organized in strict accordance with standards, norms, regulations and design drawings. Construction should be closely coordinated with plumbing and civil engineering specialties. Construction quality must conform to current standards and norms.
7、施工過程中及時(shí)做好中間檢查工作,發(fā)現(xiàn)問題及時(shí)解決,施工完后,做好自檢工作,自檢通過后再通知監(jiān)理單位工程師進(jìn)行隱蔽前驗(yàn)收工作。
7. In the process of construction, do a good job of intermediate inspection, find problems and solve them in time. After completion of construction, do a good job of self-inspection, and inform the professional engineers of supervision units to check and accept the work before concealment.
8、技術(shù)資料應(yīng)隨工程進(jìn)度及時(shí)報(bào)驗(yàn)、整理,按系統(tǒng)分類、歸檔,各種原始檢測(cè)記錄應(yīng)真實(shí)、準(zhǔn)確、齊全。
8. Technical data should be submitted and collated in time with the progress of the project, classified and filed according to the system, and all kinds of original testing records should be true, accurate and complete.
9、對(duì)于易發(fā)生受污生部位(如機(jī)房、電氣豎井等)的橋架,應(yīng)注意檢查,發(fā)現(xiàn)后及時(shí)處理,補(bǔ)刷防銹漆。
9. For bridges that are liable to contamination (such as machine rooms, electrical shafts, etc.), attention should be paid to inspection, timely treatment after discovery, and repairing rust-proof paint.
本文精彩內(nèi)容由電纜橋架整理提供!希望通過小編的介紹對(duì)大家有所幫助,我們的官網(wǎng)是:http://m.zkhtkj.cn多謝大家的閱讀觀看!
The wonderful content of this article is provided by the cable bridge arrangement! Hope to help you through the introduction of Xiaobian, our official website is: http://m.zkhtkj.cn Thank you for reading and watching!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318